task-inventory backlog bullet rewritten: "Contract lifecycle" is no longer deferred — erp#65 phase 1 shipped 2026-07-15 (thirdparty-update allowlisted + idempotent contacts; KM dossier now in the ERP with the FINAL contract terms; Hendrik Rootering contact created; only the EIN gap remains — [HUMAN]). Phase 2 (contract+services objects) and erp#67 (official-document drafting skill — T18 candidate: bilingual FR/EN signable sets, deterministic legal checklist, human-gated e-signature dispatch, billing linkage) carry the rest. The KM deferred schedule now lives IN the ERP (FAC005/FAC007 validated, due 08-23 & 09-23).
## What
Same-change truth-pass after today's landings:
- **task-inventory backlog bullet rewritten**: "Contract lifecycle" is no longer deferred — [erp#65](https://gitea.arcodange.lab/arcodange-org/erp/issues/65) phase 1 **shipped 2026-07-15** (thirdparty-update allowlisted + idempotent contacts; KM dossier now in the ERP with the FINAL contract terms; Hendrik Rootering contact created; only the EIN gap remains — [HUMAN]). Phase 2 (contract+services objects) and [erp#67](https://gitea.arcodange.lab/arcodange-org/erp/issues/67) (**official-document drafting skill — T18 candidate**: bilingual FR/EN signable sets, deterministic legal checklist, human-gated e-signature dispatch, billing linkage) carry the rest. The KM deferred schedule now lives IN the ERP (FAC005/FAC007 validated, due 08-23 & 09-23).
- **STATUS P4 map row** gains #65 (phase 1 ✅) and #67.
QA: prd_check NONE BROKEN.
🤖 Generated with [Claude Code](https://claude.com/claude-code)
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
What
Same-change truth-pass after today's landings:
QA: prd_check NONE BROKEN.
🤖 Generated with Claude Code