Files
dance-lessons-coach/bdd_implementation_plan.md
Gabriel Radureau de2e03519e
Some checks failed
CI/CD Pipeline / Build Docker Cache (push) Successful in 9s
CI/CD Pipeline / CI Pipeline (push) Failing after 3m5s
🎯 refactor: implement comprehensive BDD test suite with modular architecture
 feat: add feature-based test organization per ADR 0024
🐛 fix: resolve compilation errors in suite_feature.go
📝 docs: add comprehensive BDD framework documentation
♻️ refactor: split monolithic tests into modular features
🧪 test: implement synchronization helpers and context management
 perf: add parallel test execution capability
🔧 chore: add feature-specific test scripts and validation
📚 docs: move BDD_TAGS.md to features/ for better organization

Generated by Mistral Vibe.
Co-Authored-By: Mistral Vibe <vibe@mistral.ai>
2026-04-10 00:10:06 +02:00

8.0 KiB

BDD Implementation Plan - Iterative Approach

Based on ADR 0024: BDD Test Organization and Isolation Strategy

Phase 1: Refactor Current Tests (1-2 weeks)

Objective: Split monolithic feature files into modular, isolated components

Tasks:

  1. Split feature files by business domain

    • Create features/auth/ directory
    • Create features/config/ directory
    • Create features/greet/ directory
    • Create features/health/ directory
    • Create features/jwt/ directory
  2. Implement feature-specific isolation

    • Add config file patterns: features/{domain}/{domain}-test-config.yaml
    • Implement database naming: dance_lessons_coach_{domain}_test
    • Assign unique ports per feature group
  3. Create feature-specific test scripts

    • Implement scripts/test-feature.sh with feature parameter
    • Add environment setup/teardown logic
    • Implement resource cleanup routines

Deliverables:

  • Modular feature directory structure
  • Feature-specific configuration files
  • Basic isolation mechanisms
  • Feature-level test scripts

Phase 2: Enhance Test Infrastructure (2-3 weeks)

Objective: Add synchronization and lifecycle management

Tasks:

  1. Implement synchronization helpers

    • Add waitForServerReady() with timeout
    • Add waitForConfigReload() with event-based detection
    • Add waitForCondition() helper function
  2. Add Godog context management

    • Create feature-specific context structs
    • Implement InitializeFeatureSuite()
    • Implement CleanupFeatureSuite()
  3. Add tag-based test selection

    • Implement @smoke, @auth, @config tags
    • Add tag filtering to test scripts
    • Document tag usage in README

Deliverables:

  • Robust synchronization mechanisms
  • Proper context lifecycle management
  • Tag-based test execution
  • Improved test reliability

Phase 3: Parallel Testing (Optional - 1 week)

Objective: Enable safe parallel test execution

Tasks:

  1. Implement port management

    • Add port allocation system
    • Implement port conflict detection
    • Add parallel execution flags
  2. Add resource monitoring

    • Implement resource usage tracking
    • Add timeout detection
    • Implement cleanup on failure
  3. Update CI/CD pipeline

    • Add parallel test execution
    • Implement resource limits
    • Add test isolation validation

Deliverables:

  • Parallel test execution capability
  • Resource monitoring and limits
  • Updated CI/CD configuration

Implementation Timeline

Week 1-2: Phase 1 - Test Refactoring

  • Day 1-2: Create feature directory structure
  • Day 3-4: Implement feature-specific configs
  • Day 5-7: Create test scripts and isolation
  • Day 8-10: Test and validate refactoring

Week 3-5: Phase 2 - Infrastructure Enhancement

  • Day 11-12: Add synchronization helpers
  • Day 13-14: Implement context management
  • Day 15-17: Add tag-based selection
  • Day 18-21: Test and validate infrastructure

Week 6: Phase 3 - Parallel Testing (Optional)

  • Day 22-24: Implement port management
  • Day 25-26: Add resource monitoring
  • Day 27-28: Update CI/CD pipeline
  • Day 29-30: Test and validate parallel execution

Success Criteria

Phase 1 Success:

  • All tests pass in new structure
  • Feature isolation working correctly
  • Test scripts functional
  • No regression in test coverage

Phase 2 Success:

  • Synchronization working reliably
  • Context management implemented
  • Tag filtering operational
  • Test reliability >95%

Phase 3 Success:

  • Parallel tests execute safely
  • Resource usage within limits
  • CI/CD pipeline updated
  • Test execution time reduced

Risk Mitigation

Phase 1 Risks:

  • Test failures during refactoring: Maintain old structure until new is validated
  • Isolation issues: Implement gradual rollout with validation

Phase 2 Risks:

  • Synchronization complexity: Start with simple timeouts, enhance gradually
  • Context management bugs: Add comprehensive logging and debugging

Phase 3 Risks:

  • Resource conflicts: Implement strict resource limits and monitoring
  • CI/CD instability: Test parallel execution locally before pipeline update

Monitoring and Validation

Phase 1 Validation:

# Test each feature independently
./scripts/test-feature.sh auth
./scripts/test-feature.sh config
./scripts/test-feature.sh greet

# Verify isolation
./scripts/validate-isolation.sh

Phase 2 Validation:

# Test synchronization
./scripts/test-synchronization.sh

# Test tag filtering
godog --tags=@smoke features/

# Test context management
./scripts/test-context-lifecycle.sh

Phase 3 Validation:

# Test parallel execution
./scripts/test-all-features-parallel.sh

# Monitor resource usage
./scripts/monitor-test-resources.sh

# Validate CI/CD changes
./scripts/validate-ci-cd.sh

Rollback Plan

Phase 1 Rollback:

# Revert to original structure
git checkout HEAD~1 -- features/

# Restore original test scripts
git checkout HEAD~1 -- scripts/test-*.sh

Phase 2 Rollback:

# Remove synchronization helpers
git checkout HEAD~1 -- pkg/bdd/helpers/

# Restore original context management
git checkout HEAD~1 -- pkg/bdd/context/

Phase 3 Rollback:

# Disable parallel execution
sed -i 's/parallel=true/parallel=false/' scripts/test-all-features-parallel.sh

# Revert CI/CD changes
git checkout HEAD~1 -- .github/workflows/

Documentation Updates

Phase 1 Documentation:

  • Update README with new test structure
  • Document feature organization conventions
  • Add test execution instructions

Phase 2 Documentation:

  • Document synchronization patterns
  • Add context management guide
  • Document tag usage and filtering

Phase 3 Documentation:

  • Add parallel testing guide
  • Document resource limits
  • Update CI/CD documentation

Team Communication

Phase 1:

  • Team meeting to explain new structure
  • Hands-on workshop for test refactoring
  • Daily standups to track progress

Phase 2:

  • Technical deep dive on synchronization
  • Code review sessions for context management
  • Pair programming for complex scenarios

Phase 3:

  • Performance testing workshop
  • CI/CD pipeline review
  • Resource monitoring training

Continuous Improvement

Post-Phase 1:

  • Gather feedback on new structure
  • Identify pain points in isolation
  • Optimize test execution times

Post-Phase 2:

  • Monitor test reliability metrics
  • Identify flaky tests for fixing
  • Optimize synchronization patterns

Post-Phase 3:

  • Monitor parallel execution performance
  • Identify resource bottlenecks
  • Optimize CI/CD pipeline timing

Metrics Tracking

Test Reliability:

# Track pass rate over time
./scripts/track-test-reliability.sh

Test Execution Time:

# Monitor execution times
./scripts/monitor-execution-time.sh

Resource Usage:

# Track resource consumption
./scripts/monitor-resource-usage.sh

Future Enhancements

Post-Phase 3:

  • Test impact analysis
  • Flaky test detection
  • Performance benchmarking
  • Test coverage visualization

Long-term:

  • AI-assisted test generation
  • Automated test optimization
  • Predictive test failure analysis
  • Intelligent test prioritization

Implementation Checklist

Phase 1: Test Refactoring

  • Create feature directories
  • Split feature files
  • Implement config isolation
  • Add database isolation
  • Create test scripts
  • Test and validate

Phase 2: Infrastructure Enhancement

  • Add synchronization helpers
  • Implement context management
  • Add tag filtering
  • Test and validate

Phase 3: Parallel Testing

  • Implement port management
  • Add resource monitoring
  • Update CI/CD pipeline
  • Test and validate

Notes

  • Each phase builds on the previous one
  • Phase 3 is optional and can be deferred
  • Focus on reliability before performance
  • Maintain backward compatibility where possible
  • Document all changes thoroughly
  • Gather team feedback at each phase
  • Monitor metrics continuously
  • Celebrate milestones and successes