Files
2026-05-06 06:37:17 +02:00

2.7 KiB

Development History

This document records the historical development phases of dance-lessons-coach. Extracted from the original AGENTS.md (Tâche 6 restructure) for lazy-loading compatibility with Mistral Vibe (128k context).

All phases below are completed . They are kept here for traceability and onboarding context — refer to ADRs (adr/) for the technical decisions behind each phase.

Phase 1: Foundation

  • Go 1.26.1 environment setup
  • Project structure with cmd/ and pkg/ directories
  • Core Greet service implementation
  • CLI interface
  • Unit tests

Phase 2: Web API

  • Chi router integration
  • Versioned API endpoints (/api/v1)
  • Health endpoint (/api/health)
  • JSON responses with proper headers

Phase 3: Logging & Architecture

  • Zerolog integration with Trace level
  • Context-aware logging
  • Interface-based design patterns
  • Dependency injection

Phase 4: Documentation & Testing

  • Comprehensive AGENTS.md
  • README.md with usage instructions
  • Server management guide
  • API endpoint documentation

Phase 5: Configuration Management

  • Viper integration for configuration
  • Environment variable support with DLC_ prefix
  • Customizable server host/port
  • Configurable shutdown timeout
  • Configuration validation and logging
  • Example configuration file

Phase 6: Graceful Shutdown

  • Context-aware server initialization
  • Signal-based termination (SIGINT, SIGTERM)
  • Configurable shutdown timeout
  • Readiness endpoint for Kubernetes/service mesh integration
  • Proper resource cleanup during shutdown
  • Health endpoint remains healthy during graceful shutdown

Phase 7: OpenTelemetry Integration

  • OpenTelemetry Go libraries integration
  • Jaeger compatibility for distributed tracing
  • Middleware-only approach using otelhttp.NewHandler
  • Configurable sampling strategies
  • Graceful shutdown of tracer provider
  • OTLP exporter with gRPC support

Phase 8: Build System & Documentation

  • Build script for binary compilation
  • Binary output to bin/ directory
  • Comprehensive commit conventions with gitmoji reference
  • Updated documentation with Jaeger integration guide
  • Cleaned up configuration files
  • Enhanced logging configuration with file output support

Phase 9: Final Refinements

  • Removed unnecessary time.Sleep for log flushing
  • Changed server operational logs from Info to Trace level
  • Moved all logging setup logic to config package
  • Simplified server entrypoint to 27 lines
  • Verified all functionality with comprehensive testing
  • Updated documentation to reflect final architecture

Beyond Phase 9

Subsequent work (CI/CD, BDD scenarios, ADR audit, JWT, config hot-reloading) is tracked in the Changelog and the corresponding ADRs.