docs(prd): STATUS truth-pass — erp#43/#44 shipped, #40 built (bar met), entry points re-baselined #32

Merged
arcodange merged 1 commits from arcodange/status-20260719 into main 2026-07-19 00:32:35 +02:00
Owner

End-of-session truth-pass (2026-07-19):

  • erp#44 (PR erp#70) — idempotency keys, replay = no-op proven live (historic manifest-B 5/5 deduped).
  • erp#43 (PR erp#72) — GED attach op, idempotent by (object, filename, sha256), rehearsed live.
  • erp#40 built on a local branch — critical-field accuracy 100 % (bar 98 %), 6/6 injections quarantined pre-model; stacks on #39's branch, both awaiting the operator push gate.
  • erp#54 → PR erp#71 open; merging it = Accepting adc-001…005 (operator act).
  • Cold-start entry points re-baselined: #41/#42, #51, #45 (once #39/#40 land); operator-gated items listed explicitly.
  • PR-log rows for erp#70/#71/#72.

🤖 Generated with Claude Code

https://claude.ai/code/session_01VRShc4QhLLU73FLHx9vskh

End-of-session truth-pass (2026-07-19): - **erp#44** ✅ (PR erp#70) — idempotency keys, replay = no-op proven live (historic manifest-B 5/5 deduped). - **erp#43** ✅ (PR erp#72) — GED attach op, idempotent by (object, filename, sha256), rehearsed live. - **erp#40** built on a local branch — **critical-field accuracy 100 % (bar 98 %), 6/6 injections quarantined pre-model**; stacks on #39's branch, both awaiting the operator push gate. - **erp#54** → PR erp#71 open; merging it = Accepting adc-001…005 (operator act). - Cold-start entry points re-baselined: #41/#42, #51, #45 (once #39/#40 land); operator-gated items listed explicitly. - PR-log rows for erp#70/#71/#72. 🤖 Generated with [Claude Code](https://claude.com/claude-code) https://claude.ai/code/session_01VRShc4QhLLU73FLHx9vskh
arcodange added 1 commit 2026-07-19 00:32:27 +02:00
arcodange merged commit 37b9e183d9 into main 2026-07-19 00:32:35 +02:00
arcodange deleted branch arcodange/status-20260719 2026-07-19 00:32:35 +02:00
Sign in to join this conversation.
No Reviewers
No labels
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: arcodange-org/factory#32