4 Commits
Author SHA1 Message Date
arcodangeandClaude Fable 5 5430e5f3ac docs(prd): dated roadmap leaf — Gantt, milestone spine, re-baselining rule
New roadmap.md: mermaid Gantt (validated) putting the six phases on
calendar time from baseline 2026-07-11 — P2 e-invoicing opens the plan
(ADR D4 target 08-14, two-week fallback before the hard 09-01), P1
flagship in parallel (golden set first, A2 earned ~10-09), ledger-
compliance verifications early September (FY-2026 FEC depends on the
accounting-module answer), P3 standing fleet through autumn (sentinel
24/7 ~11-13), P4 money-loop exit over December, P5 riding the fiscal
calendar (acompte 12-15, CA3 switch 01-01, Q1 filing April, CA12 early
May, AG 06-30), P6 e-reporting proven months before 2027-09-01.
Immovable-milestone table, dependency notes, re-baselining rule
(engineering bars slide, diamonds don't — slips shed scope instead).
Wired: hub pointer + leaves row, poc-plan/STATUS backlinks.

Co-Authored-By: Claude Fable 5 <[email protected]>
2026-07-11 15:02:02 +02:00
arcodangeandClaude Fable 5 a00f5cb065 docs(prd): sandbox-vs-prod posture + certified-accounting-grade operations
New compliance.md leaf: French bookkeeping obligations mapped to fleet
mechanisms — inaltérabilité (L.123-22) via an append-only production
ledger grammar (create/validate/pay/avoir, never mutate a validated
document) enforced by a promote-plan compliance linter; FEC (L.47 A
LPF) with quarterly export + Test Compta Demat validation (accounting-
module binding flagged as unverified gap); piste d'audit fiable (289
VII CGI) framed as a by-product of journals + tx-id reco + monthly
packs; retention, numbering, copie fiable; loi anti-fraude scoped out
(B2B-only) with BlockedLog as sandbox-first belt-and-braces.

New Environments section in agent-architecture: prod = the ledger
(grammar-bound), sandbox = disposable iso-prod rehearsal (exempt, never
wired to production third parties); side_effect_class -> environment/
credential mapping; POCs write on sandbox only; evals target fresh
checkpoints; irreversible-by-design features trial on checkpoints.

Woven through hub (goal, requirement, success criteria, leaves table),
T03/T05/T15 guardrails, QA (linter suite, pure-append snapshots, FEC
cadence, PAF evidence framing), C2, POC-1 exit criteria.

Co-Authored-By: Claude Fable 5 <[email protected]>
2026-07-11 14:48:20 +02:00
arcodangeandClaude Fable 5 8920547a98 docs(prd): D4 leaning — Qonto as the plateforme agréée (ex-PDP)
Operator direction: Qonto is the capital-deposit bank, a DGFiP-registered
PA with e-invoicing included in every plan, and the fleet's richest
existing API integration. POC-6 rewritten from shortlist to validation
spike (reception + business-API pull + GED archival + 2027 e-reporting
path for the KM export invoices); C12 residual now names the vendor-
concentration trade-off; terminology refreshed PDP -> PA (renamed by the
administration in July 2025); 2027-09 milestone clarified (e-reporting
for export invoices; emission only if a French B2B client arrives).

Co-Authored-By: Claude Fable 5 <[email protected]>
2026-07-11 14:39:41 +02:00
arcodangeandClaude Fable 5 169c8debb4 docs(prd): AI back-office — agent fleet for daily admin & accounting
New PRD tree vibe/PRD/ai-back-office/ (hub + 6 leaves + STATUS): task
inventory T01-T16 with mode operatoire, atom/contract architecture on
the ADR-0003 write gate, four-tier model fleet (Claude/Mistral/M4/Pi),
12 challenges with mitigations, POC plan with exit criteria, QA
strategy with autonomy promotion gates. Index row + bidirectional
backlinks (erp guidebook, safe-prod PRD).

Co-Authored-By: Claude Fable 5 <[email protected]>
2026-07-11 14:25:04 +02:00