docs(prd): D8 settled — fleet/ landed with erp#62; STATUS truth-pass

erp#38 shipped 2026-07-15 (PR erp#62, independent locate-test PASS):
D8 row flipped leaning→settled, P1 phase row 🟡 in progress with the
first , cold-start entry point advances to erp#39 (golden set).

Co-Authored-By: Claude Fable 5 <[email protected]>
This commit is contained in:
2026-07-15 18:43:34 +02:00
co-authored by Claude Fable 5
parent bda53f299a
commit 8232ed7987
2 changed files with 7 additions and 7 deletions
+5 -5
View File
@@ -2,8 +2,8 @@
# STATUS — implementation tracker
> **Status:** 🟢 Current — backlog decomposed into issues (2026-07-11); sharpened with per-issue Execution footers + splits #59/#60 (2026-07-12)
> **Last Updated:** 2026-07-12
> **Status:** 🟢 Current — backlog decomposed into issues (2026-07-11); sharpened with per-issue Execution footers + splits #59/#60 (2026-07-12); **execution started — erp#38 shipped, D8 settled (2026-07-15)**
> **Last Updated:** 2026-07-15
> **Up:** [AI back-office hub](README.md)
> **Related:** [POC plan](poc-plan.md) · [Roadmap](roadmap.md) (dated plan; actuals and slips land here)
@@ -12,7 +12,7 @@
| Phase | Scope | State |
| --- | --- | --- |
| 0 — Foundations | read skills, sandbox + promote, backups, snapshots, bank reco, email ingest, Telegram gateway MVP | ✅ shipped pre-PRD (ledger below) |
| 1 — Flagship pipeline | [POC-1](poc-plan.md#poc-1--supplier-invoice-end-to-end) + [POC-5](poc-plan.md#poc-5--model-routing-bench) | ⬜ decomposed → [erp milestone P1](https://gitea.arcodange.lab/arcodange-org/erp/milestone/1) (erp#3845, #47 — due 2026-10-09) |
| 1 — Flagship pipeline | [POC-1](poc-plan.md#poc-1--supplier-invoice-end-to-end) + [POC-5](poc-plan.md#poc-5--model-routing-bench) | 🟡 in progress → [erp milestone P1](https://gitea.arcodange.lab/arcodange-org/erp/milestone/1) (erp#3845, #47 — due 2026-10-09) · **#38 ✅ 2026-07-15** ([PR erp#62](https://gitea.arcodange.lab/arcodange-org/erp/pulls/62)) |
| 2 — Urgent compliance | [POC-6](poc-plan.md#poc-6--e-invoicing-readiness-spike) — **hard deadline 2026-09-01** | ⬜ decomposed → [erp milestone P2](https://gitea.arcodange.lab/arcodange-org/erp/milestone/2) (erp#46 — due 2026-09-01) |
| 3 — Standing fleet | [POC-2](poc-plan.md#poc-2--pi-sentinel), queue, digest + approval cards | ⬜ decomposed → [erp milestone P3](https://gitea.arcodange.lab/arcodange-org/erp/milestone/3) (erp#4850, #59 — due 2026-11-13) + [gateway#1](https://gitea.arcodange.lab/arcodange/telegram-gateway/issues/1)/[#2](https://gitea.arcodange.lab/arcodange/telegram-gateway/issues/2) |
| Ledger compliance (cross-cutting) | [Dolibarr verifications](compliance.md#dolibarr-verifications-sandbox-first) | ⬜ decomposed → [erp milestone](https://gitea.arcodange.lab/arcodange-org/erp/milestone/4) (erp#51 — due 2026-11-27) |
@@ -22,11 +22,11 @@
## Backlog map
Every phase is decomposed into **self-contained issues** (context, deliverables, acceptance criteria, dependencies, PRD links); since 2026-07-12 each issue also carries an **Execution footer***Blocked by / Blocks / Human gates / Start (worktree + first command) / Done means (evidence comment → PR with `Closes #N` → doc sweep)*. How a future session resumes: **order open milestones by due date, pick the top issue whose "Blocked by" is clear — and skip issues whose only open step is a `[HUMAN]` gate** (surface those in the digest instead of stalling on them; e.g. erp#46 step 1 is operator-owned). Cold-start entry points as of 2026-07-12: **erp#38** (the fleet entry issue), **erp#51** (startable today), **erp#41/#42/#43/#44** (write-skill side, independent of the scaffold). **Arbitration: one session = one lane** — take the entry issue; an orchestrator may fan the independent lanes out in parallel (#38#51#4144 touch disjoint directories); everything else follows due-date order (dates in the phase tracker above). The issue body carries everything; on any doubt the trust order is live system > code > STATUS > leaves. Cross-cutting decisions get their ADRs via [factory#22](https://gitea.arcodange.lab/arcodange-org/factory/issues/22).
Every phase is decomposed into **self-contained issues** (context, deliverables, acceptance criteria, dependencies, PRD links); since 2026-07-12 each issue also carries an **Execution footer***Blocked by / Blocks / Human gates / Start (worktree + first command) / Done means (evidence comment → PR with `Closes #N` → doc sweep)*. How a future session resumes: **order open milestones by due date, pick the top issue whose "Blocked by" is clear — and skip issues whose only open step is a `[HUMAN]` gate** (surface those in the digest instead of stalling on them; e.g. erp#46 step 1 is operator-owned). Cold-start entry points as of 2026-07-15 (post-#38): **erp#39** (golden set — the eval half of the harness, now unblocked), **erp#51** (startable today), **erp#41/#42/#43/#44** (write-skill side, independent of the fleet tree). **Arbitration: one session = one lane** — take the entry issue; an orchestrator may fan the independent lanes out in parallel (#39#51#4144 touch disjoint directories); everything else follows due-date order (dates in the phase tracker above). The issue body carries everything; on any doubt the trust order is live system > code > STATUS > leaves. Cross-cutting decisions get their ADRs via [factory#22](https://gitea.arcodange.lab/arcodange-org/factory/issues/22).
| Repo | Issues |
| --- | --- |
| [erp](https://gitea.arcodange.lab/arcodange-org/erp/issues) | **P1:** #38 fleet scaffold+AGENTS.md (D8, **entry issue**) · #39 golden set+injection fixtures · #40 invoice-extract atom · #41 provenance checker · #42 compliance linter · #43 GED attach op · #44 idempotency keys · #45 POC-5 routing bench (D5) · #47 POC-1 exit gate (umbrella) — **P2:** #46 POC-6 Qonto-as-PA (D4; step 1 = [HUMAN] Qonto UI) — **P3:** #48 T13 drift watchdog · #59 T14 backup freshness+drill · #49 T17 second-brain hooks (D7; meeting lane D9 parked) · #50 POC-2 Pi sentinel (D6) — **Compliance:** #51 Dolibarr verifications (FEC/BlockedLog, startable today) — **P4:** #52 POC-3 reco+payments · #53 T05 client invoice (D3, ⚠️ July manual ~07-23) — **P5:** #54 fiscal profile+calendar files+ADC register · #60 T11 reminder loop · #55 POC-4 TVA dry-runs — **Ops (post-replay):** #56 known-patterns fix · #57 bucket C + document gaps |
| [erp](https://gitea.arcodange.lab/arcodange-org/erp/issues) | **P1:** #38 fleet scaffold ✅ 2026-07-15 (D8 settled, PR erp#62) · #39 golden set+injection fixtures (**entry issue**) · #40 invoice-extract atom · #41 provenance checker · #42 compliance linter · #43 GED attach op · #44 idempotency keys · #45 POC-5 routing bench (D5) · #47 POC-1 exit gate (umbrella) — **P2:** #46 POC-6 Qonto-as-PA (D4; step 1 = [HUMAN] Qonto UI) — **P3:** #48 T13 drift watchdog · #59 T14 backup freshness+drill · #49 T17 second-brain hooks (D7; meeting lane D9 parked) · #50 POC-2 Pi sentinel (D6) — **Compliance:** #51 Dolibarr verifications (FEC/BlockedLog, startable today) — **P4:** #52 POC-3 reco+payments · #53 T05 client invoice (D3, ⚠️ July manual ~07-23) — **P5:** #54 fiscal profile+calendar files+ADC register · #60 T11 reminder loop · #55 POC-4 TVA dry-runs — **Ops (post-replay):** #56 known-patterns fix · #57 bucket C + document gaps |
| [telegram-gateway](https://gitea.arcodange.lab/arcodange/telegram-gateway/issues) | #1 Postgres durable queue (D1) · #2 daily digest + approval cards |
| [factory](https://gitea.arcodange.lab/arcodange-org/factory/issues) | #22 ADRs as decisions close (D1/D2/D4/D6/D7) |