Files
erp/test/scripts
arcodangeandClaude Opus 5 dbe4b36c62 feat(write-skill): chronology guard + explicit production opt-in
Two guards, both from real incidents in the same session.

1. invoice-create.sh — chronology (CGI art. 289). Dolibarr assigns the number at
   validation, in creation order, so issuing a document dated BEFORE the last one
   already issued gives a higher number to an earlier date. The July plan walked
   straight into it: the M3 deferred part is due 2026-10-23 and must be issued at
   D-60 (24/08) to stay under the L.441-10 I ceiling, while the M4 fixed part is
   dated 23/08 — issue them in the wrong order and the numbering breaks. The
   guard reads the last issued document of the same kind and refuses an earlier
   date, with ARCO_ALLOW_BACKDATE as a loud, documented override.
   Verified: refuses a 01/07 invoice against FAC008 (23/07), accepts 23/08.

2. test/scripts/guard.ts — production opt-in. The sandbox-only guard had no way
   to express a deliberate production run, so any prod work meant bypassing it
   entirely (which is how guards die). Production now requires BOTH
   ARCO_ALLOW_PRODUCTION=<exact host> and
   ARCO_PROD_CONFIRM=I-UNDERSTAND-THIS-WRITES-PROD, and prints a banner. Nothing
   reaches prod by inheriting an ambient variable.
   Also fixes a misleading "(sandbox verified)" log that printed even on prod.

grantAgentRight.ts joins the repo (it was never committed) and gains --revoke,
so a temporarily elevated right can be handed back — used today to attach a
payment in production and revoked immediately after.

Co-Authored-By: Claude Opus 5 (1M context) <[email protected]>
Claude-Session: https://claude.ai/code/session_01VRShc4QhLLU73FLHx9vskh
2026-07-26 01:26:12 +02:00
..
2025-08-08 17:57:56 +02:00